亚洲图色在线-亚洲网视频-亚洲网在线观看-亚洲网站大全-欧美高清在线不卡免费观看-欧美高清在线精品一区二区不卡

CN ???ENGwelcome to the official website of Su Zhou United machine co.,ltd

50 years focused on

High tech enterprises. Horizontal screw centrifuge strength manufacturers

0512-65657076

139-0620-3239

Location:首頁>>News>>FAQ

Product line

National Service Hotline

0512-65657076

How to disassemble the bearing of horizontal screw centrifuge drum?

Time:2021-06-18 06:27:22  Clicks:723

How to disassemble the bearing of horizontal screw centrifuge drum?
As we all know, the horizontal screw centrifuge often runs at high speed in the whole process of work, so the requirements for bearings are relatively high. When there are some problems in the bearing of the drum when sending mail, how can the actual operation ensure that the working characteristics of the horizontal screw centrifuge are not easily harmed? We can see the following main contents.
Horizontal screw centrifuge
1.When dismantling the small end bearing of horizontal screw centrifuge drum, the anchor bolt on the end pin of the main pulley should be removed first, and then the end pin should be removed with couplers, Make sure that the bearing force of the screws is consistent and there is no need to tilt. Then take down the end pin and pull out the belt pulley with a three leg die.
2.In addition, in the case of disassembly, it is not necessary to forget to mark the relevant parts to facilitate reassembly. Next, dismantle the shaft hole, the screw at the tapered end of the groove, the sealing ring of the bearing seat, and its O-ring at one time. On the bearing inner hole pad of the horizontal screw centrifuge drum bearing, pull out the bearing sleeve, the rotating cover of the bearing sleeve, the bearing and its coupling with three feet.

3.After the small end bearing is disassembled, the big end bearing is removed. The same special tool of technical specialty should be applied. The actual process is to remove the anchor bolts of flange plate, and then remove the transfer case and its gear shaft. Then, loosen and remove the anchor bolt on the bearing end cover pin, and press the bearing end cap pin with the suitable butt fastener. It is also important to note that, When removing the bearing of the drum big end of the horizontal screw centrifuge, the bearing force of the screw should be consistent without any skew. On the bearing body of the shaft inner hole pad, pull out the connecting flange and bearing seat sealing ring together with the three foot drawing die, and then remove the shaft hole.
Horizontal screw centrifuge
In fact, there is no great difference between the two whole process basis, so the actual operation staff should pay attention to it. At this time, it is necessary to make a good record, so as to facilitate the reassembly work. On the bearing inner hole pad of the shaft, the bearing sleeve, bearing cover, bearing and coupling are pulled out with a three foot drawing die, and the corresponding marks are made on the bearing sleeve of the horizontal screw centrifuge.


Home Tel Contact
主站蜘蛛池模板: 三级网站视频 | 黄色作爱 | 成人毛片视频免费网站观看 | 久久国产精品一国产精品 | 成人永久免费视频 | 午夜毛片免费观看视频 | 欧美性巨大欧美 | 精品中文字幕在线 | 亚洲国产成人在线 | 亚洲一区二区三区国产精品 | 99久久亚洲 | 免费人成年短视频在线观看免费网站 | 看一级特黄a大片国产 | 日韩 综合 | 国产精品2020 | 日本性色| 久草视频在线网 | 一级片免费在线 | 欧美午夜免费毛片a级 | 欧美视频一区二区专区 | 亚洲精品美女在线观看 | 三级免费毛片 | 在线观看国产欧美 | 亚洲国产一区二区三区四区五区 | 国产日产欧产精品精品推荐小说 | 国产亚洲精品激情一区二区三区 | 一级片视频免费观看 | 欧美成人在线免费观看 | 国产精品久久久久久免费播放 | 国产东北色老头老太性视频 | 亚洲bbbbbxxxxx精品三十七 | 偷看各类wc女厕嘘在线观看 | 亚洲国产成人久久综合区 | a级成人毛片久久 | a毛片在线 | 2022久久免费精品国产72精品 | 香蕉成人在线视频 | 男人扒开腿躁女人j | 亚洲精品一区二区三区四区手机版 | 韩国毛片免费 | 中文字幕在线看 |